Unofficial integration, not affiliated with OpenEI, NREL or any utility. It prices your electricity consumption in Gladys with the tariff of your US utility, read from the Utility Rate Database (URDB) of OpenEI: the public database of the rates of about 3,700 US utilities (time of use, seasons, tiers, fixed charges, demand charges), maintained for the Department of Energy (data under CC0).
It adds contract templates to Energy > Contracts (one per US time zone), priced by the integration (Gladys "delegated" mode): you type the label of your URDB tariff in the contract, the integration reads that tariff and returns the cost of each half hour your meter reports.
Tried against the real URDB API (version 7, DEMO_KEY) on 2026-11-11 with
three real tariffs (PG&E E-TOU-C and E-1, APS R-3), with the fake Gladys of the
SDK, and in a Gladys 5.3 sandbox in Docker (a contract created on the E-TOU-C
tariff, its current price read); never tested with a real Gladys at home, on a
real meter and a real bill.
Setup
- Get a free API key on the OpenEI sign-up page
(https://openei.org/services/api/signup/). For a first try,
DEMO_KEYworks too, but it is shared and limited to about 10 requests an hour. - Install the integration, type the key in its configuration. The key is
kept by Gladys in its database, never shown again, sent only to
api.openei.org(in a request header, never in an address), never written in the logs, the status or/data. - Find the label of your tariff: the Find tariffs button lists the
approved tariffs in effect for a 5-digit ZIP code (residential by default),
label first. You can also search on https://apps.openei.org/USURDB/: the
label is the end of the tariff page address (24 characters, for instance
69de6fa62aa9e9994f0ed2bd); the whole address is accepted too. Check the name on your bill: a utility often has several regions and plans. - In Energy > Contracts, create a contract on your electric meter with the template OpenEI URDB tariff of your time zone (Eastern, Central, Mountain, Arizona without daylight saving, Pacific, Alaska, Hawaii), type the label, and the fixed charge (below). The contract timezone must be the one of your utility: the time-of-use hours of URDB are its local hours.
- The status of the integration shows each tariff in use: its name, the utility, the date it took effect, the date it was read, what Gladys does not compute, and its fixed charge.
What is computed
For each half hour, in the local time of the contract:
- Time of use and seasons: the period of the URDB schedule for that month and hour, the weekend schedule on Saturday and Sunday. Daylight saving changes follow the contract timezone (the repeated hour of November is priced as that local hour, twice).
- Tiers: judged on the kWh of the billing period before that half hour (Gladys sends them; the billing period starts on the day set in the contract). A half hour straddling a bound is split pro rata. A bound in "kWh daily" (the California baseline allowances) is summed over the days of the billing period, counted inside the contract validity (a contract starting mid-period gets the days it covers), each day with the bound of its own season: a period across June 1 gets its May days at the winter allowance and its June days at the summer one. The validity is read again from Gladys for every pricing, so a contract whose dates you change is priced with the new ones. With time of use, the tiers count all the kWh of the period, every time slot together.
- Price = rate + adjustment of the tier, plus the monthly fuel adjustment when URDB has one, in $/kWh. The cost returned to Gladys is the energy only.
- Fixed charge: Gladys computes it itself from the contract. URDB gives it per day, month or year: the status shows it, type it in the field "Fixed charge per day" or "Fixed charge per month" of the contract (a yearly charge is shown divided by 12; a unit URDB does not give is shown as "unknown unit": check it on your bill).
- A tariff still in draft in URDB (not approved by its reviewers) is priced too, and its line in the status says "not approved in URDB".
The current price (dashboard, scenes) is the price of the time slot now for the kWh already counted in the billing period, with the time of the next change of time slot and its price. It cannot foresee a tier change that the consumption to come will cause.
What is not computed: said, never faked
Gladys prices a delegated contract per half hour; some parts of a US tariff do not fit that model. They are left out of the cost. When the tariff has them, the first two are listed in the status of each tariff ("not computed by Gladys"); the others are never in the status:
- Demand charges ($/kW of peak demand:
demandratestructure, monthlyflatdemandstructure, coincident demand). They depend on the peak of the whole billing period, which a half hour priced alone cannot know. Your bill will be higher than the Gladys cost by these charges. - Minimum bill (
mincharge). - Holidays: URDB has no holiday calendar; a holiday is priced like the other days of its week (weekday rates on a weekday holiday).
- Selling back (net metering,
sellrates): Gladys prices consumption only. - Taxes and local fees that URDB does not list.
Some tariffs are refused (no cost at all rather than a wrong one, with the reason in the status): tiers bounded in kWh per kW of demand ("kWh/kW"), a rate below 0 or above 10 $/kWh (a data error), a schedule pointing nowhere, a tariff without energy charge, a tariff outside the USA. Gladys then shows those half hours without a cost and asks again later.
Freshness of the data
URDB is maintained by hand: a tariff may be years old or may have been replaced by a newer one with another label. The status shows the date each tariff took effect ("in effect since") and, when URDB has one, the date it ended. When your utility changes its rates, find the new label and create a new contract from that date.
Each tariff is read when a contract needs it, then at most once a day,
and kept in /data with the date it was read: a restart (with /data
readable), an outage of OpenEI or the quota never stops the pricing of a
tariff already read.
While /data cannot be read (a disk problem), nothing is written to it and
no tariff is read from OpenEI (a refusal or a pause it holds would be
unknown): a contract created meanwhile is not priced until /data is
readable again; the status says so. It is read again every 10 seconds.
Quota and errors
- OpenEI limits the requests per key and per hour (
DEMO_KEY: about 10). The integration sends one request at a time, at least 2 seconds apart, one per tariff and per day, plus one per click of a button. A 429, an "over rate limit" answer or a quota at 0 pauses every request (an hour, doubled, up to 6 hours;Retry-Afterhonoured); a server error pauses a minute, doubled. The pause survives a restart. - A key refused by OpenEI (
API_KEY_INVALID,API_KEY_DISABLED...) stops every request sent on its own until you save another key or the Test button succeeds. Another 403 or a 401 is not a refusal. After a restart, the refusal is recognized by a fingerprint of 8 bits of the key (never the key): a different key has 1 chance in 256 to be taken for the refused one at a restart; the Test button lifts it. - A tariff that cannot be read is tried again 10 minutes later, doubled up to 6 hours. Its pricing fails meanwhile (Gladys retries); a tariff already read keeps pricing.
- The Test button sends at most one request per click, and none when the key was accepted less than 10 minutes ago and no tariff is due.
Data and licence
Tariff data: Utility Rate Database, OpenEI (NREL, data collected for the US
Department of Energy), under CC0 (public domain dedication). This
integration is under the Apache License 2.0; see THIRD_PARTY_NOTICES.md.
Konfigurationseinstellungen
Diese Einstellungen fragt OpenEI URDB (US tariffs) in seinem Konfigurationsbildschirm in Gladys ab.
| Einstellung | Typ | Pflichtfeld | Beschreibung |
|---|---|---|---|
| US electricity tariffs (OpenEI URDB) | section | Nein | Unofficial, not affiliated with OpenEI or NREL. Adds contract templates to Energy > Contracts: pick the one of your time zone, then type the URDB label of your tariff ("Find tariffs" button below). The integration reads that tariff from the Utility Rate Database (once a day at most, kept in /data) and prices your consumption: time of use, seasons, tiers. Demand charges ($/kW) and the minimum bill are not computed; the fixed charge is typed in the contract. Holidays are priced like other days (URDB has no holiday calendar). URDB data can be old: the status shows the effective date. |
| OpenEI API key | secret | Ja | Free, from the OpenEI sign-up page (40 letters and digits). Kept by Gladys in its database, never shown again, sent only to api.openei.org. |
So installierst du OpenEI URDB (US tariffs) in Gladys
- Öffne in Gladys Integrationen: OpenEI URDB (US tariffs) erscheint im Katalog neben den nativen Integrationen, mit einem Community-Badge.
- Klicke auf Installieren. Gladys lädt das Docker-Image (
ghcr.io/lm1lc3n7/gladys-openei-urdb:0.1.1) herunter, startet es in einer vom Kern isolierten Sandbox und erzeugt die Oberfläche der Integration (Geräte, Erkennung und Konfiguration). - Öffne den Bildschirm Konfiguration der Integration, fülle die Einstellungen aus und speichere.
- Du kannst sie auch direkt über die URL ihres Repositorys installieren: https://github.com/LM1LC3N7/gladys-openei-urdb.
OpenEI URDB (US tariffs) benötigt Gladys >=5.2.0. Der Katalog in Gladys wird stündlich aktualisiert, eine neue Version ist also spätestens eine Stunde nach ihrer Veröffentlichung verfügbar.
Du nutzt Gladys noch nicht? Es ist kostenlos und Open Source: folge der Installationsanleitung, um loszulegen.
Über externe Integrationen
OpenEI URDB (US tariffs) ist eine externe Integration: eine Community-Integration, die als Docker-Container verpackt und auf GitHub veröffentlicht wird. Gladys installiert sie mit einem Klick und führt sie in einer vom Kern isolierten Sandbox aus. Sie wird von LM1LC3N7 veröffentlicht und gepflegt, nicht vom Gladys-Kernteam.
- Alle Integrationen durchsuchen, native und aus der Community
- Deine eigene externe Integration bauen und veröffentlichen
- Quellcode auf GitHub — Quelle dieser Dokumentation